Summary: CC-J
Regional computing center for PHENIX
- data analysis for the regional collaborators and simulation
- size: is about 1/4 of the RCF
- construction: will start in JFY 1999 and completed in 3 years under the current plan. 1/3 scale of CC-J will be operational in the in the end of 1999.
- Duplication of the PHENIX Data (whole DST, a part of Raw date, and related data base) are requested to PHENIX/RCF.
- Preparation and R&D for CC-J started
- in collaboration with RCF and PHENIX computing group
- DST duplication method (via tape)
- DB replication method (via the Internet)
- prototype of simulation and analysis farm at RBRC at BNL