1. Overview
2. Concept of the system
3. System Requirement
4. Other requirement as a Regional Computing Center
5. Plan and current status
6. WG for constructing the CC-J (CC-J WG)
7. Current configuration of the CC-J
8. Photographs of the CC-J
9. Linux CPU farm
10. Linux NFS performance v.s. kernel
11. HPSS current configuration
12. HPSS performance test
13. WAN performance test
14. Summary
ëOÇÃÉXÉâÉCÉh | éüÇÃÉXÉâÉCÉh | ç‰èâÇÃÉXÉâÉCÉhÇŠñþÇÈ | ÉOÉâÉtÉBÉbÉNÉXÇÃï\é¶ |