Proposal for the PHENIX Computing Center in Japan (Draft)

NB: This is a draft version and may be updated.  Please check
http://spin.riken.bnl.gov/ccj/doc/plan/ to obtain the latest version.

		           December  2, 1998  23:00 EST

			   Takashi Ichihara (RIKEN, RBRC)
                           Yasushi Watanabe (RIKEN, RBRC)
                           Naohito Saito    (RIKEN, RBRC)
                           Yuji Goto        (RIKEN)
                           Hideto En'yo     (Kyoto Univ., RBRC )
			   Hideki Hamagaki  (CNS, Univ. of Tokyo)
			   Shinya Sawada    (KEK)
                           Ryugo S. Hayano  (Univ. of Tokyo)
		          

Contents

1. Introduction 1.1 Overview 1.2 Background 1.3 Purpose of the CC-J 1.4 Size of the CC-J 1.5 Concept of the CC-J Facility 2. Requirements 2.1 Physics 2.1.1 Simulation 2.1.2 Data Mining 2.1.3 Physics Analysis 2.1.4 General Computing 2.2 System Requirement 2.2.1 Annual Data Volume Requirement 2.2.2 Disk Storage Requirement 2.2.3 I/O Throughput Requirement 2.2.4 CPU Requirement 2.2.5 Software Requirement 2.2.6 Network Switch requirement 2.2.7 WAN 2.2.8 Data Duplication 3. Facility Components 3.1 Managed Data Server (HPSS + SMP Server) 3.2 CPU Farms for Analysis and Simulation 3.3 Software 3.4 Network Switch 3.5 WAN 3.6 Data Duplication at RCF (DST) 3.7 Human Resources 4. Construction plan 4.1 Construction Plan 4.2 R&D for CC-J at BNL 5. Operation 5.1 Relationship between RCF, PHENIX and CC-J 5.2 Organization of the CC-J 5.3 Operation of the CC-J 5.4 Relation to RCF 6. Cost and Personnel Overview 7. Summary References Appendix A1 (Simulation Requirement) Appendix A2 (Simulation Requirement for Spin Physics) Appendix B (US-Japan WAN Connectivity)

1. Introduction

1.1 Overview

We propose to construct a PHENIX Computing Center in Japan (PHENIX CC-J) at the RIKEN Wako campus over a three year period, beginning in 1999. The CC-J is intended as the principle site of computing for PHENIX simulation, a regional PHENIX Asian computing center, and as a center for the analysis of spin physics. The planned computing capacity will be sufficient to meet the bulk of the simulation needs of PHENIX. The planned robotic storage capability will permit efficient micro-DST production as a regional computing center. By providing a vital source of regional computing, the CC-J will also encourage collaborators from China, Korea, India and Japan to be actively involved in analysis of PHENIX physics data.

Importantly, the planned capabilities of the CC-J are in concert with the research plans of RIKEN and RIKEN BNL Research Center, which initiated the RHIC spin program and which plan to expand their involvement in the entire PHENIX program.

1.2 Background

The
computing requirements of the PHENIX experiment at RHIC are very demanding. As detailed in the reports, "RHIC Computing Facility" [1] and "Off-line Computing for RHIC" [2] by the RCF (RHIC Computing Facility), PHENIX will eventually need tertiary storage of 700 Terabytes per year and CPU in excess of 8,500 SPECint95. The computing requirements for PHENIX have since been updated in the report "PHENIX's Computing Requirement"[3]. In this report the CPU requirement was increased to 18,000 SPECint95.

The RCF can not meet the complete computing needs of the four current RHIC experiments, nor is it intended to. The RCF has been designated as the principle resources for raw data archiving and primary event reconstruction, and each of the experiments was urged to identify outside resources to address the rest of their computing needs. For instance, the STAR experiment is planning to use NERSC to fulfill a large part of their computing needs for event and detector simulation.

The idea of a PHENIX CC-J first arose three years ago through discussions among the Japanese PHENIX participants. Further discussions with the PHENIX Detector Council (DC) and Executive Council (EC) members were held to clarify the structure and purpose of the CC-J. The concept of the CC-J was very favorably received by the PHENIX collaboration, and it has become an integral and essential part of the overall PHENIX plan for computing.

Therefore, we propose to construct the PHENIX CC-J as a regional computing center at RIKEN over a period of three years beginning in 1999. RIKEN Wako headquarters has encouraged this project and they have promised to donate 100 TB of tertiary storage in the Tape Robot System of STK Powderhorn and four RedWood Tape Drives from the new RIKEN Super Computer System which will be installed in January 1999 and they will also provide HPSS software and hardware from the RIKEN general computing environments for CC-J Project. All these parts will be installed by March 1999.

1.3 Purpose of the PHENIX CC-J

The PHENIX CC-J is intended to serve as the main site of computing for PHENIX simulations, a regional Asian computing center for PHENIX, and as a center for SPIN physics analysis. In order to fulfill these aims, the CC-j plans to carry out the following more specific functions: It should not taken lightly that data accessibility is often the most critical factor in promoting activities in data analysis. Japanese groups are already actively participating in the PHENIX Physics Working Group, and hope to play a role in the physics analysis. Some of them are: With the CC-J, we would hope to enhance the throughput of PHENIX analysis.

1.4 Size of the CC-J

The following table shows the planned size of the CC-J as it is proposed to evolve over the next 3 years. The rationale underlying the requirement for each item will be discussed in chapter 2.

Dec. 1999 Dec. 2000 Dec. 2001
CPU farm (SPECint95) 2400590010700
Tape Storage size (TB) 100 100 100
Disk Storage size (TB) 5 10 15
Tape I/O (MB/sec) 68 90 113
Disk I/O (MB/sec) 200 400 600
SUN SMP Server Unit 2 4 6

1.5 Principle concept of the CC-J System

The following figure shows the principle concept of the CC-J in relation to the RCF.

Architecture of the CC-J follows that of the RCF (without reconstruction farm), and the identical key software products for database, HPSS etc, will be adopted. It should help keep compatibility in software, and facilitates the software development and maintenance.

Mechanism of exchange data and information needs to be established between the RCF and the CC-J.

DST or raw data transfer via network is not feasible, at least massively, in the coming few years. As is shown in the figure, data duplication facility has to be established in the RCF, in order to transfer DST's via postage. In reverse, a similar function is implemented in the CC-J side, in order to export simulation data and micro-DST. The duplication facility will be built both at the RCF and CC-J sides. As will be discussed in 3.5.1, we expect that the exportation of the simulation date will be available via the Internet in 2001.

We hope to have wider network bandwidth available in a year between US and Japan thanks to APAN project. With wide bandwidth available, database access and software update can be performed via network with minimum delay. On the database, replication method is the most favorable, and testing has to be initiated soon to verify this method. Keeping software compatibilities at PHENIX is performed using the AFS software, and wider bandwidth should assure smoother software accessibility.

2 Requirements

In this chapter, the size of system is determined by the following assumptions: RCF will be utilized as the common computing environment for the RHIC Project including STAR, PHENIX, PHOBOS, BRAHMS etc at BNL. About 1/3 of the RCF resource is assumed to be used for PHENIX. In this chapter, the estimate for the PHENIX requirement is based on the report of "PHENIX's Computing Requirement" by Soren Sorensen and The PHENIX Offline Computing Group [3].

2.1 Physics Requirements

2.1.1 Simulation Requirement

The PHENIX CC-J is the principle site of computing for PHENIX simulation. The PHENIX CC-J needs to meet the requirement of the entire PHENIX simulation. Concerning to the CPU requirement of the simulation, we basically follow the work of "PHENIX's Computing Requirement"[3]. We have incorporated feedback from the Mock Data Challenge 1 (MDC-1) in the following estimates.

According to Ref. [3], it is required to simulate the events of the order of 5M events for each year, which corresponds to 0.5% of the experimental data. The size of the event by the simulation (PISA) is 6MB for one event. This requires the storage area of 30 TB/year. According to the MDC-1, the CPU required to generate one event is [11.9 K (central) + 40.0 k (muon)] = 51.9 k SPECint95 sec. The CPU required to generate 5 M events is 8200 SPECint95 Disk space for the workarea corresponding to the data amount of a months (3.3TB) is required for the production and reconstruction.

  [Simulation Requirement]
  --------------------------------------------
   Storage (Sim. result)          30 TB/year
   Work Disk Area                3.3 TB
   CPU(event generation)        8200 SPECint95
   CPU(event reconstruction)    1300 SPECint95
   CPU(event analysis)           170 SPECint95
  ----------------------------------------------
The new estimate for the simulation requirement for spin physics is described in Appendix A. It is suggested that even with pT selected simulations, which are efficient to minimize the CPU time, 7000 SPECint95 is required for background studies of spin physics to complete event generation and event reconstruction.

2.1.2 Data mining Requirement

Taking into account the variety of physics goals of PHENIX, we anticipate at least 10 independent micro-DST productions will be performed per year at CC-J. The micro-DST production is ultimately limited by the I/O speed of the tape drives. In the proposed CC-J system we can store the DSTs and the micro-DSTs of a half year ((150+45)/2= 97.5TB) in the tape drives. We need access them in 10 days and the required I/O bandwidth for the tape drives is about 112 MB/s. We think that this is a very moderate requirement, because the requirement for this I/O throughput in the ROCOCO report [1] is as follows: "Filter must be able to cull micro-DS T from 100 TB DST data set in 24 hours", which corresponds to 1160 MB/s I/O bandwidth. The table below summarizes the "Data Mining Requirements".

  [Data Mining Requirement]
  -----------------------------------------
   Storage (DST)               150 TB/year
   Storage (micro-DST)          45 TB/year
   I/O (tape Read)             112 MB/s
   I/O (HPSS-SUN SMP)          112 MB/s
  -------------------------------------------
One difference from Ref. [3] is the is the size estimate of the Data Summary Tape (DST). Although we learned that the size of the DST was 120% of that of raw data at the MDC-1, we expect this ratio will be improved and we assume that the size of DST is a half of that of raw data. We recognize that in the data mining the CPU requirement necessary to perform I/O is not significant.

2.1.3 Physics Analysis Requirement

Physics analysis will be performed for the micro-DST many times. We assume about 1/5 of the micro-DST is required to be resident in DISK: this corresponds the DISK storage of 9 TB. The Disk I/O bandwidth is important for micro-DST production, Physics analysis for micro-DST and also simulation production. Assuming that the access to the whole micro-DST on disk (9TB) can be done 5 times in a day, the required disk read bandwidths is more than 520 MB/sec.


   [Physics Analysis Requirement]
  -------------------------------------------
   Storage (micro-DST)          45 TB/year
   DISK Storage (micro-DST)      9 TB
   DISK I/O                    520 MB/s
   CPU(requirement)           1000 SPECint95
  -------------------------------------------

2.1.4 General computing Requirement


  Assuming there are 100 uses for the CC-J and each users 
need 5GB as a permanent file, the required disk storage of the
user permanent files is about 500GB. 

  [General Computing Requirement]
  ----------------------------------------------
   Disk Storage (permanent file) 500 GB
   CPU                           200 SPECint95
  -----------------------------------------------

2.2 System Requirement

2.2.1 Annual Data Volume Requirement

The following table shows the current estimate of the annual data amount for PHENIX experiment at the nominal year. The Raw data from the PHENIX detector comes at 20MB/s and this yields 290 TB for each year. Since the reconstruction of the Raw Data at the nominal year is out of the scope of the CC-J, the storage for the Raw Data is not counted.

Annual Data Volume
item PHENIX RCF-PHENIX CC-J
Raw Data 290 290 0
Calibrated Data 0.1 0.1 0.1
Simulated Data 30 30 30
Data Summary Tape 150 150 150
uData Summary Tape 45 45 45
Total ~515TB ~475TB ~225TB

To handle the data amount, Hierarchical Storage System (HSM) with tape robotics and disk system, such as High performance Storage System (HPSS) is required. HPSS is developed at the Storage laboratory under DOE project. HPSS has been also adopted at many high-energy accelerator laboratories in the world.

2.2.2 DISK storage requirement

To store the simulation results (3.3TB), a part of micro-DST (9 TB), user permanent file, and user work file, totally 15.3 TB of disk space are required.

  [Disk Storage requirement]
   simulation result    3.3 TB
   micro-DST            9   TB
   user permanent file  0.5 TB
   user work file       2.5 TB
  ----------------------------
   Total Disk          15.3 TB

For the long-term reliability and maintenancebility, this DISK system will be configured by RAID.

2.2.3 I/O throughput for the storage

(a) Following I/O throughputs are required for Tape and Disk.

     -----------------------------------
     Tape I/O          112 MB/s
     Disk I/O          520 MB/s
     -----------------------------------

2.2.4 CPU requirement

Following table shows the estimate of the CPU requirement for the PHENIX. A large portion of the CPU requirement of CC-J is occupied by the Simulation, because the PHENIX CC-J is the principle site of computing for PHENIX simulation.

Since CC-J does not reconstruct raw data in the nominal year, the event reconstruction part of the CPU for the experimental raw data is not necessary. This estimation shows the CPU requirement of the CC-J is about 11261 SPECint95.


CPU Requirement
item PHENIX RCF-PHENIX CC-J
Event Reconstruction 6084 6084 0
Data Analysis 1700 1700 1000
Theoretical Model 800 0 800
Simulation 7991 0 8200
Simulation Event Reconst. 1300 0 1300
Data Analysis of Sim. 170 0 170
Total 18045 7784 11470

For micro-DST production, the CPU requirement is rather small and we assume that this can be done with the CPU's in the SUN SMP server.

2.2.5 Software Requirement

Following environment of software are required: the PHENIX and RCF programming environments, including HPSS, AFS, Objectivity/DB, batch queueing system, UNIX programming development environments including C++, C, Fortran, perl and file-system backup package etc.

Since the PHENIX Programming environment relies on the AFS environment, we recognize that the mirroring AFS server for RHIC cell (for PHENIX portion) at the CC-J is important. Otherwise, in the case of network outage between BNL and CC-J, some influences will be appeared in the programming environment. This AFS mirroring can be done via WAN.

Replication of the experimental data bases such as calibration data base, tag data base etc. at the CC-J is also required. This can be also done using WAN.

2.2.6 Network Switch Requirement

Network switches are required to connect HPSS Servers, the SMP Data Servers, and the CPU farms. The bandwidth should be large enough to extract the performance of the HPSS System.

2.2.7 WAN Requirement

In order to exchange data between RCF and CC-J, a proper bandwidth of the WAN between RCF and CC-J are required. Also in order to access CC-J from the domestic and Asian collaborators, proper bandwidth with the domestic and Asian and Japanese institutes are required. These requirement will be discussed at section 3.4 with plan.

2.2.8 Data Export/Import Requirement

In order to produce micro-DST from DST, it is required that the DST will be duplicated and imported from RCF to CC-J. The simulation output produce by the CC-J is required to be exported to the RCF.

This will be discussed in section 3.5.

3. Facility component

Following figure shows the schematic diagram of the PHENIX CC-J.

Following list shows the major facility component of the CC-J. Since the architecture of the CC-J essentially follows the RCF [1,2], detailed explanation for the part common to the RCF is omitted in this session.

3.1 Managed Data Server (Storage System)

1. Tape Robot

[Requirement] handle 225 TB / year

  • 1/2 of STK silo (Powderhorn 9310)
  • Capacity: 100 TB
  • HPSS supported

    This is a part of the RIKEN Super computer system. 100 TB partition of the STK silo and RedWood drives are permanently allocated for the CC-J project by the effort of RIKEN Wako headquarters.
    The capacity of 100 TB can handle data of half years on line. Other data are stored at off-line shelves. This on-line/off-line storage ratio is same as RCF.
  • 2. Tape drive unit

    [Requirement] I/O throughput 112 MB/s

  • RedWood SD-3 Tape Drive, 10 units
  • I/O throughput 11.25 MB/s for each unit

    The RedWood SD-3 Tape drive is a Helical Scan Cartridge Subsystem which has 11.25 MB/s performance with sustained and uncompressed mode. Since two units need to data export/import between RCF, total I/O throughput for 8 unit is 90 MB/s which satisfies 80% the requirement.
  • 3. HPSS System

    [Requirement] HSM such as HPSS

  • HPSS Software Release 4.1
  • HPSS Hardware
    - 5 node of SP2 (20 Power PC604 CPU, totally 288 SPECint95)
    - SP Switch with 300 MB/sec performance
    - SP Switch Router with 8-port 100BaseT and 1-port HIPPI interfaces
    - 250 GB HPSS cache disk (RAID)
    - 27 GB HPSS ENCINA disk (RAID)
    - Totally 3.0 GB Memory

    The HPSS Release 4.1 software and hardware will be installed at RIKEN Wako in March 1999 as a part of RIKEN general computing environment and they are dedicated to the CC-J project. Contract between RIKEN Wako and IBM Japan for the HPSS hardware and software was concluded in November 1998.

    HPSS Hardware consists of 5 node of SP2, each node is connected to each other using SP Switch at the 300 MB/sec I/O performances. Each SP2 node consists of quad Power PC 604 CPU (16.4 SPECint95/cpu), 512 or 1024 MB Memory, Differential Fast/Wide SCSI interface, a SP switch interface of 300MB/s and 100BaseT interface. Two RedWood drives will be connected to each SP2 node. For the external network connection, a SP Switch Router, which has a HIPPI interface (100MB/s) and 8-port 100BaseT interface, is connected to the SP2 Switch and all the I/O to the LAN will be carried out via this SP2 Switch router.

    Since the I/O throughput between the HPSS servers and SUN SMP servers is crucial to the tape I/O bounded operation such as data mining, we will use 800Mbps HIPPI interfaces and HPSS Switch instead of multiple 100BaseT interfaces. Currently 1000BaseT (Gigabit Ethernet) is not supported for the SP2. In addition, it is reported that the performance of HIPPI is better than that of 1000BaseT. According to the report of http://www.ods.com/white/whi_0009.shtml, it is reported that

  • HIPPI has achieved throughput speeds of 720Mbits/second vs. Gigabit Ethernet only reaching 400Mbits/second

  • Typical CPU Utilization of a HIPPI attached host is <30% during a transfer vs. hosts which are Gigabit Ethernet attached operating at 100% CPU utilization when they are transferring across the network

  • It might be expected that the performance of the Gigabit ethernet will be improved in a near future with the increase of the CPU performance. For the connection between pentium II CPU farms and the HPSS servers, we are planning to use 8 sets of the 100BaseT interface from SP router.
  • 4. Disk Storage System

    [Requirement] Capacity: 15 TB, I/O throughput: 600 MB/s

  • RAID file system (50GB disk x 11(data+parity) + 1 Hot standby) = 500 GB, 20MB/s)
  • 30 unit of RAID file system ( 15TB, 600 MB/s)

    This disk storage system consists of 30 Raid file systems. Each Raid5 system consists 11 units of 50 GB (data+parity) disk and one hot- standby disk (totally 12 disks). 3.5" size 50 GB disk with 15-25MB/s transfer rate will be available in 1999. 15 TB consists of 30 sets of Raid5 file system, which consists of 330 unit of (data+parity) disk and 30 unit of hot-standby disks. When a disk failure occurs in a Raid5 system with hot-standby disk, failed disk will be cut off to off-line and hot-standby disk will be connected in place and rebuilding process occurs automatically. During the rebuilding process, the read/write access to the data on this file system is available. After the rebuild is finished, this raid5 system returns to a normal operation mode. The disk failure will be notified to the operator by E-mail and some indicator, and the failed disk can be hot-swapped at any time without affecting the system operation.

    Adopting Raid system is very important in the point of security and reliability of the data and maintenancebility for the entire system. Assuming the 500,000 hours of Mean Time Before Failure (MTBF) of each disk, which is typical values for high-performance disk, the disk failure rate for the system using 300 disks is one every 2 months statistically. By adopting the Raid system, interference on the system operation by the disk failure will be eliminated.

    Possible disadvantage in adopting the RAID system is degradation of the write performance, which is expected by parity calculation and parity writing. In the most case, however, the number of read operation is many times larger than that of the write operation and then this will not make a serious problem. Nevertheless, if high-write performance for the file system is required for some parts, these parts of the disk file system can be configured with NON-RAID configuration.

  • 5. SMP Data Server

    [Requirement] connect and serve disk file system of 15 TB capacity at the I/O throughput of 600 MB/s

  • SUN Enterprise E4500 (6 CPU), 6 unit

    Totally 15TB of disks are connected to these servers. Each server is equipped with 1000BaseT. Six units of the SMP server will satisfy the 600 MB/s networking I/O as well as Disk I/O. These servers are NFS-mounted from client computers. These servers are also connected to the IBM SP2 HPSS server via HIPPI interface and HIPPI switch. Access to the HPSS will be done by pftp command over the HIPPI Interface.

    Since data mining from DST to micro-DST is I/O bounded operation but not CPU bounded, data mining should performed mostly on these SMP Data Servers.

  • 6. Special Servers

    [Requirement] replication of the experimental data base and mirroring of the AFS server

  • To satisfy this request, following servers to be installed
    - AFS mirroring server
    - Objectivity replication server
    - etc.

  • 3.2 CPU farm

    [Requirement] SPECint95: 11470

  • PC box (Pentium II 128MB Memory/CPU, 3GB disk/CPU, 100BaseT)
  • 300 Units

    The CPU farm consists of 300 unit of pentium II processors. The configuration of each CPU box is almost identical to that of RCF. Prototype of this CPU farm which consists of 20 Pentium II (450 MHz) processor is now working at BNL as described in session 4.2. In Ref [1], it is assumed that the SPECint95 performance of the Pentium II becomes twice for every 2 years and this is true for the last two years, we adopt the same assumption. Then the SPECint95 of the Pentium II and CPU farm will be expected as follows.


    CPU Performance
    SPECint95purchase unit Total SPECint95
    1998 Sep. 17.2 0 0
    1999 Sep. 24.3 100 2430
    2000 Sep. 34.4 100 3440
    2001 Sep. 48.6 100 4860
    Total 300 10730

    Total performance of 300 CPU units is estimated to be 10730 SPECint95, which almost satisfies the requirement.

  • 3.3 Software component

    [Requirement] the PHENIX and RCF programming environments, including HPSS, AFS, Objectivity/DB, batch queueing system, UNIX programming development environments including C++, C, Fortran, perl and file-system backup package etc.

  • Software environment listed above are to be installed

  • 3.4 Network Switch

    [Requirement] connect HPSS Server, SUN SMP Server and CPU Farms

  • Switching Speed: 16 Gbps or more
  • Upstream port: 6 1000Base TX
  • Downstream port: 300 100Base TX for the CPU farm
  • HIPPI Switch (7 port)

    The network switch with the performance above will be installed.

  • 3.5 WAN

    3.5.1 US- Japan connectivity and APAN

    We are going to have wide network bandwidth available between US and Japan thanks to APAN (Asia-Pacific Advanced Network) project. APAN is a non-profit international consortium, and is intended to be a high-performance network for research and development on advanced applications and services (see http://www.apan.net/). The US-Japan leased line of the APAN is supported by the Science and Technology Agency (STA) Japan. PHENIX collaborating institutes in Japan including RIKEN, CNS Univ of Tokyo. etc submitted two proposals of using APAN for the PHENIX project in summer of 1997 and these proposals have been approved.

    APAN stated operation in September of 1998 with 35 Mbps US-Japan leased line and this line is scheduled to be upgraded at 70 Mbps in January 1999. This US-Japan leased line is available only for limited sites of authorized APAN institutes including RIKEN, CNS, Univ. of Tokyo, Kyoto Univ. etc and as a result, we expect that a relatively high bandwidth of the APAN US-Japan leased line will be available for the PHENIX project.

    With wider bandwidth available, database access and software update can be performed via network with minimum delay. On the database, replication method is the most favorable, and testing has to be initiated soon to verify this method. Keeping software compatibilities at PHENIX is performed using the AFS software, and wider bandwidth should assure smoother software accessibility. The mirroring of the AFS server at CC-J is also in consideration.

    The detailed of the US-Japan WAN connectivity is described in Appendix B.

    The following Table shows the brief idea of the BNL - CCJ WAN utilization in the coming years. The real bandwidth availability and utilization depend strongly on the future bandwidths and traffic conditions of the APAN US-Japan line, ESnet backbone, and BNL-ESnet connection. We assume that 10% of the APAN US-Japan bandwidths is available for the connection between RCF and CC-J, since there are about 20 applications approved in APAN-Japan and two of them are PHENIX applications.

    We assume that the interactive sessions and mirroring and replication of the experimental Data base, and same experimental data transfer will be done via the Internet. For the interactive session, typical required bandwidth per one X-terminal session is 100 Kbps as described in the Ref [1].

                      
      CCJ-BNL WAN Utilization future estimate
    
         Year     CC-J Total  CC-J int.  CC-J non-inter. (APAN US-JP)
         -----------------------------------------------------------
         1998     3.5 Mbps     2 Mbps      1.5 Mbps       35 Mbps
         1999      7  Mbps     4 Mbps       3 Mbps        70 Mbps
         2000     15  Mbps     7 Mbps       8 Mbps       (155 Mbps)
         2001     31  Mbps    10 Mbps      20 Mbps       (310 Mbps)
    
    

    The required bandwidth is 12 Mbps to transfer simulation result of 30TB/year from CC-J to RCF assuming 65% utilization of the bandwidth. We expect that this bandwidth will be available in 2001. There is a possibility that the entire simulation result will be transfered via the WAN at that term.

      Required bandwidth to transfer data over WAN
    
        Data amount /year   100% utilization    65% utilization
        -------------------------------------------------------
          30 TB (simulation)    7.6 Mbps           11.7 Mbps
         150 TB (DST)          38.1  Mbps          58.5 Mbps
    
    
    To transfer a DST of 150TB/year from RCF to CC-J, The required bandwidth is 60 Mbps assuming the 65% utilization of the bandwidth. to transfer a DST of 150TB/year from RCF to CC-J. We suppose this bandwidth will be available in 2003 or later.

    Until these bandwidth becomes available, the data transfer for these will be done via the SD-3 Cartridge Tape (50GB/cartridge) with RedWood drive.

    N.B. Round Trip Time (RTT) between BNL and Japan is governed by light velocity in optical fiber and the length of the fiber between Japan and US. This RTT is no less than 150 m sec. We need some kind of R&D study in order to extract good performance with relatively large RTT WAN environment.

    3.5.2 domestic connectivity

    We plan to use HEPNET-J as well as IMnet and SINET for the domestic WAN connections with PHENIX-J collaborating institutes.

    3.6 Data Duplication at RCF (DST)

    In order to export the DST to CC-J, Data Duplication Facility will be prepared at the RCF. The main components of the facility are (1) two RedWood tape drives to write DSTs and (2) one (IBM) tape server to connect these tape drives. A planning duplicating method is following:

    1) Pulling out a reconstructed data file from the HPSS to a disk (normal unix file system) on the tape server with using pftp, just after the file putting in the HPSS and before purged from cache disks on HPSS.
    2) Copying the file to a tape with using standard "tar" or "dd".

    Absence of the data export/import function of HPSS causes such rather complicated method. The method will be replaced by the function of HPSS, when it will be available. We are requesting to the HPSS developer the function to be realized at the HPSS Release 4.2 which is expected to be released in the end of 1999. Two RedWood drives for the Data Duplication Facility are minimum requirement from the data throughput point of view as following.

    Maximum throughput of one RedWood drive (11.25 MB/s) is almost same as the required DST production rate (10 MB/s) which assuming DST has 1/2 size of raw data. This means one RedWood drive does not have enough contingency for the data exporting and also the facility will be used as importing simulated data from CC-J.

    An adoption of high capacity tape media as the RedWood contributes to make smaller labor cost for tape handling (putting in/pulling out tapes to the robotics, packaging for transport etc.

    3.7 Human resource

    Success of the CC-J depends much on the quality of system management and operation we can obtain. Estimated cost of system management and operation (one SE and two operators in the current plan) is high, and this is primarily because of a special situation in Japan that these specialists will not be employed but will be provided from companies via maintenance contracts. We can expect close-to-excellent support from the companies.

    In order to design, re-design, and maintain the HPSS system, a special system engineer who has sophisticated knowledge and experience of HPSS is required at full-time base at the CC-J.

    To handle duplicated tapes at RCF, we expect that 0.5 FTE operator or technician is required to be allocated at the data duplication facility at the RCF. We are now discussing with RCF how to prepare this workforce.

    To design and maintain the hardware architecture, a technical manager is required at full-time base time.

      items                                   requirement
     --------------------------------------------------------------
      technical manager                       1  full time equiv..
      user support 				  1  full time equiv..
      programming consultant	          1  full time equiv.
      system engineer                         1  full time equiv.
      operator                                2  full time equiv.
      ana/sim production coordinator          2  full time equiv.
      operator at RCF for data dup.           1  full time equiv.
    
    

    4. Construction plan

    4.1 Construction plan

    The CC-J will be constructed in three years at RIKEN Wako Campus, starting in JFY 1999 and finished in JFY 2001. In the end of the 1999, about 1/3 capacity of the CC-J will be operational.

    Following figure shows the construction plan of CCJ.

    The super computer of RIKEN will be replaced in January 1999. New supercomputer is Fujitsu VPP700E with 128 CPU (307.2 GFLOPS), 256 GB Memory and 4.4 TB Disk etc. A STK Tape Robot (powder horn) of 250 TB capacity (same as RCF STK silo) with 10 redwood drives will be installed as a part of the super computer. Since RIKEN headquarters decided to support CC-J project, among the STK robot of Super computer system, 100 TB STK storage capacity and 4 redwood tape drives are promised to exclusively allocated for the CC-J project. Also HPSS Software and HPSS Hardware, which is dedicated to the CC-J project, will be installed in RIKEN by supplimentaly budget of JFY 1999. HPSS Hardware consists of 5 node of SP2 , a SP switch of 300MB/s, a SP2 Router and 270GB disk for HPSS cache.

    Following table shows the plan of CC-J construction. Before the purchase of phase-1 construction, CC-J already have some resources by the in-kind contributions from RIKEN.


    item Mar. 1999 Dec. 1999 Dec. 2000 Dec. 2001
    CPU farm (number) 0 100 200 300
    CPU farm (SPECint95) 0 2400 5900 10700
    Tape Storage size 100 TB 100 TB 100 TB 100TB
    Disk Storage size 0.3 TB 5 TB 10 TB 15TB
    Tape Drive (number) 4 6 8 10
    Tape I/O (MB/sec) 45 67.5 90 112.5
    Disk I/O (MB/sec) 50 200 400 600
    SUN SMP Server Unit 1 2 4 6
    HPSS Server SP2 node5 5 5 5

    CPU power achieved by the 300 PC's is about 10700 SPECint95 which is about 1/2 of the total CPU power of the RCF (17500 SPECint95). CPU power of the PC's matches the requirement of ~9000 SPECint95 from entire simulation tasks of the PHENIX experiment.

    The micro-DST production is ultimately limited by I/O speed of tape drives. Total of eight tape drives will yield the maximum data transfer speed of 90 MB/sec, which is a little less than 1/2 of the current RCF proposal of 200MB/sec. We believe capability of the CC-J as an analysis center can be very high with this high I/O bandwidth. Additional tape drives or Storage Robots will be added, if needed.

    Preparation for "specification" for the Phase 1 purchase of the CC-J will start early 1999. The budget for the CC-J Phase 1 construction will be available in April 1999, if there is no delay in the approval in the Diet. Then we will start the process of bid for the Phase-1 purchase. On this schedule, the installation of the phase 1 devices will be in September or October 1999. We plan to start the CC-J operation in December 1999.

    The startup of the HPSS is scheduled on March 1999 with rater limited hardware resources. The main concern of the HPSS at this point is the data transfer between SUN SMP servers and IBM HPSS servers with several 100BaseT HIPPI interfaces.

    4.2 R&D for CC-J at BNL

    In April 1998, R&D for the
    1. Prototype of data duplication facility
    2. Prototype of simulation and data analysis hardware
    has been started at BNL as a part of activity of the Experimental Group of RIKEN BNL Research Center (RBRC).

    Next figure shows an idea of duplicating facility of DST for CC-J at RCF. To facilitate, we are planning to install one tape drive (RedWood) and one tape server to connect tape drives as a prototype in JFY 1998. It will be occurred at when RCF will purchase more drives before MDC-2. We will add one more tape drive (RedWood) in JFY 1999. We are also planning to share the STK tape robot at RCF for this DST duplication and detailed method is currently under discussion with RCF.

    As a proto-type of the CC-J CPU farm, we have constructed CPU farms consists of 20 pentium II CPU at 450 MHz and one SUN E450 (4-CPU) file server. This system was completed in October 1998 and installed at the RCF machine room and working very stably. In the SUN E450 server, the user file system of 45GB is consists of RAID system with hot stand-by disk, which assure the reliability in the case of disk failure. In a standard rack, 8 Dell PC's with dual Pentium II processor (totally 16 CPU) are mounted. Each PC and SUN E450 server are connected to a high performance Network switch (CISCO 2916M) at 100BaseT and this switch is connected to the RCF LAN. In order to assure security of the system, ssh connection is required to connect this system and "TCP Wrapper (tcpd)" is configured tightly to accept the connection only from proper sources. Also all the recent security patches for the Operating systems have been installed.

    The spin-physics simulation production with PHENIX simulation program (PISA) and STAF is now carried on. Also evaluation for important technical information, such as NFS read and write performance of Linux, CPU performance for PHENIX software, etc are in progress. Also test for the arla software (FreeWare version of the AFS client) has been in progress and it (arla) has been working stable. These date are very important to design the CC-J system.

    5. Operation

    
    The organization of the CC-J is planned to fulfill the following
    issues;
    
    1: Establish effective and transparent operation for the PHENIX simulation
       and data analysis project. 
    2: Activate Japanese and Asian interests maximumly and establish the
       computing resources for them.
    3: Keeping good contact with the RCF and PHENIX computing organizations.
    4: Best usage of present human resources available at RIKEN and RBRC.
    
    The organization reflects the relation of the CC-J to the RCF and PHENIX
    which is schematically shown in the figure below.
    


    5.1 Organization of CC-J

    The next table summarize the organization of the CC-J. +-------------------------------------------------------------------+ | | | CC-J director M.Ishihara | | | | CC-J Advisory Board | | | | Planning and Coordination Office | | manager T.Ichihara (RIKEN and RBRC) | | technical manager Y.Watanabe (RIKEN and RBRC) | | scientific programming coordinator | | H.En'yo (Kyoto and RBRC, Phenix-EC) | | H.Hamagaki (CNS-U-Tokyo, Phenix-EC) | | N.Saito (RIKEN and RBRC) | | computer scientists | | user support 1 (TBD) | | program development 1 (TBD) | | | | Technical Management Office | | manager Y.Watanabe (RIKEN and RBRC) | | System engineers 1 (TBD) | | System operators 2 (TBD) | | | +-------------------------------------------------------------------+

    CC-J Director is responsible for the entire CC-J project, and should be acting as a spokesperson of the project both for RIKEN-Wako and RBRC.

    Advisory Board is formed under the request from the director to make advice on the guide-line of the CC-J operation. PHENIX spokesperson and PHENIX computing coordinator are natural members of this board.

    The Planning and Coordination Office (PCO) is responsible for operation of the CC-J. PCO distributes the computing resources to the individual computing projects in order to maximize the physics outputs. PCO is also responsible for making an effective plan and its realization for the development of the CC-J hardwares and softwares to match the PHENIX analysis requirements. PCO includes some of Japanese members of PHENIX Executive Council (EC) to coordinate regularly the operations and the developments of the CC-J.

    Proposals for a PHENIX computing project in the CC-J are to be submitted to this office. User supports for the accepted projects are also PCO responsibility. The conflicts between computing projects are to be solved through this office. The manager of PCO can also expect Advisory Board's opinion on some severe conflicts.

    The Technical Management Office (TMO) is responsible for running the entire CC-J system alive. TMO is the sub office of PCO and responsible for maintenance and operation of the CC-J system. The development plan of the CC-J should be primarily reviewed in this office.

    5.2 Operation of CC-J (Relation to PHENIX)

    CC-J PCO expects that any large PHENIX computing project to be performed in the CC-J is reviewed in the PHENIX physics working groups under the guidance of CC-J PCO and the consultation of the PHENIX computing coordinator. The proposal should be submitted to CC-J PCO in advance to invoke the procedure for approval which will be given after PCO studies the feasibility of project. PCO reserves the authority for distribution of CC-J resources to the approved projects, in order to maximize the physics outcomes along the general goals imposed to the CC-J and to cope with the plan for the development of the CC-J.

    CC-J PCO may requires an individual computing project to assign a Japan-resident contact person, in order to avoid conflicts among the projects or un-thoughtful job-submissions which cause a loss of the CC-J system performance.

    5.3 Relation to RCF

    CC-J PCO is responsible to establish mutual connectivity and transparency between RCF and CC-J. To clear the relation among RCF and CC-J, MOU may be prepared when needed. The major issues newly required in the RCF site for the sake of the CC-J operation are;

        export of Data Summary Tapes  and import of Simulation Data Tapes
        replication of Objectivity Database over the WAN, and
        mirroring AFS over the WAN
    
    While the CC-J is going to prepare necessary new hardwares in the RCF site, adjustment of the scopes of responsibility of RCF and CC-J is on going. For the duplication of data tapes, necessary manpower coordination will be subject to an agreement among RCF, CC-J and PHENIX.

    6. Cost and Personnel Summary

    We estimate that the total construction cost of the CC-J for three years (JFY 1999-2001) is 435 M Yen (about $ 3.5 M). We are to request the budget of 203 M Yen ( 145 M Yen for the construction and 58 M Yen for the operation) to the Science and Technology Agency (STA) Japan through RIKEN-BNL Research Center. This initial budget corresponds to 1/3 of the full CC-J scope.

    7. Summary

    In Summary, the PHENIX CC-J, if realized as a plan, will become an attractive regional computing center of the PHENIX experiment. It will serve as the major computing resources for PHENIX simulation and a major resource for data analysis. Significant gain for the physics outputs is expected both in the heavy-ion physics and spin programs.


    References

    [1] Interim Report of the RHIC Off-line Computing Committee (RococoII), B.S. Kumar, M.D. Baker, H.J. Crawford, B.G.Gibbard, K.Hagel, D.L. Olson, R.L. Ray, R. Seto, S.P. Sorensen, T.G. Throwe, G.R. Young, Yale 40609-1179, October 16, 1995,
    http://www.rhic.bnl.gov/html/planning/rococo2/interim_report.ps

    [2] Offline Computing for RHIC, M. Baker, J.Flanagan, B. Gibbard, K. Hagel, T. Healy, S. Kumar, W. Love, E. Nicolescu, D. Olsen, C. Price, L. Ray, T. Schlagel, S. Sorensen, A. Stange, T. Thowe, F. Videvaek, R. Healy, R. Houge, G. Rabinowitz, D. Stampf,M. Strongson, G. Tsai, July 20 1997, http://www.rhic.bnl.gov/html/reviews/proposal.ps

    [3] PHENIX's Computing Requirement, Soren Sorensen and The PHENIX Offline Computing Group, November 24, 1997, http://uther1.phy.ornl.gov/offline/requirements/PhenixComputingRequirements.html


    Appendix A1 : Requirement of Simulation

    Following document is taken from Ref. [3], PHENIX's Computing Requirement, Soren Sorensen and The PHENIX Offline Computing Group, November 24, 1997,

    Simulated Data Volume

    In general we want to track all the theoretical data through GEANT in order to compare to our data. The most important contribution for GEANT CPU time for PHENIX is however the calculation of acceptance and efficiencies by the "particle gun" method in which the total possible acceptance of PHENIX is bombarded uniformly with particles, which then are embedded in real events (or simulated events before we have any real data) and reconstructed using the same software as for the raw data. PHENIX will need in the order of 30,000 acceptance cells, corresponding to 3-10 cells in each of the following dimensions: rapidity, Pt, azimuthal angle, vertex position, total hit multiplicity and particle species. In each cell we will require an accuracy of 1% thereby requiring 10,000 particles being deposited in each cell. Annually we need in the order of 10 different tables corresponding to different magnetic field strength, detector configuration etc. This leads to a total need of 30,000 * 10,000 * 10 = 3 G Particles. Since PISA currently tracks about 1000 particles in PHENIX's active volume this corresponds approximately to 3M events annually in addition to the approximately 2M needed for the theoretical models.

    Each PISA event is about 8 M Bytes, so the total amount of simulated raw data annually will be 5,000,000 * 8 MBytes = 40 TBytes.

    Simulation CPU Need

    The equivalent of 5,000,000 events have to be tracked through PISA each year. Each event will require 43 kSPECint95*sec resulting in 7600 SPECint95. A slightly more detailed calculation taking the differences between the central and the muon arm into account leads to final value of 8000 SPECint95.  This is a very large number, which we hope to be able to reduce by developing more efficient fast detector simulation software. However, fast simulators will most likely also result in a new need for larger samples of "phase-space" correct particle distributions from event generators in order to estimate the background for rare processes like Upsilon production.

    Simulated Data Reconstruction CPU

    For our estimates we have assumed the calculation of efficiency tables will dominate PHENIX's requirements for simulated data reconstruction. Annually 3G tracks are created and in principle each of these tracks will have to be independently embedded in a real event which would result in the reconstruction of 3 billion events, which are 3 times more than the number of real events from the detector. However, it is assumed that we can embed 10 particles in each event as long as they are chosen not to overlap. This reduces the total number of reconstructed events to 300 million annually, which will require 300,000,000 * 120 SPECint95*sec /  31556736 / 0.9 =~ 1300 SPECint95. This number also includes a small contribution of 22 SPECint95 for reconstruction of the theoretical models.

    Simulated Event Summary Data Volume

    The data volume of a simulated event is much larger than a real raw event due to the additional information stored concerning the hit and track origin of the counts in each channel. The hit information data volume has already been estimated in the section on the simulated data volume. The simulated event size will be (in kBytes): 300 (raw data) + 300 (referential data to hit/track info) + 750 (intermediate objects) + 18 (pure event summary data) =1368 kBytes. However, only a small fraction of all the reconstructed data for efficiency calculations needs to be stored for later reference. We estimate 1%. We will therefore annually store 2,250,000 (theoretical models) + 1% * 300,000,000 (efficiency calculation) = 5.25M events. The total data volume will therefore be: 5,250,000 * 1368 kBytes = 11 TBytes.

    Data Mining of Simulated Data

    Naturally the data mining of the simulated data will be done much less frequent. We estimate that only 10% of all data mining queries will be done on the simulated data corresponding to a total of 30 queries a year. However, whenever a query is done to that data all of it will have to be considered, which annually is 40 TBytes (Simulated hits) + 11 Tbytes (ESD) =~ 50 TBytes. This data will, however, be naturally clustered, since in general the queries will be limited to extracting the information from a particular run for a theoretical model. We will therefore not put much emphasis on the reliability of the numbers estimated in this section, since the data mining of simulated data will not stress the MDS due to the very high degree of natural clustering of the data.


    Appendix A2 : Simulation Requirement for Spin Physics

    Simulation Requirements for Spin Physics

    Yuji GOTO and Naohito SAITO
    RIKEN / RIKEN BNL Research Center
     

    Abstract

    We estimate CPU time required for CC-J by picking up typical physics topics, prompt photon measurement. Simulations for background study will be very CPU intensive. Even with pT selected simulations, which are efficient to minimize the CPU time, about 500 SpecInt95 is required for signal and background studies of spin physics to complete event generation and event reconstruction.
     

    1. Introduction

    As in any other experiments, simulations studies are inevitable for physics analysis in PHENIX for following reasons:
    (a) confirming our understanding of the detector performance,
    (b) evaluating systematics involved in the analysis procedure, and
    (c) interpreting the experimental results.

    For example, in the measurement of the gluon polarization via asymmetry for prompt photon production, we need to know the performance of EMCal especially photon reconstruction efficiecy, two shower separation, hadron rejection, and energy and position resolutions. We have already have some beam test data for EM calorimeter and simulation will be be well-tuned to reproduce the test results.

    In the analysis procedure, we will employ the method called "isolation cut" to enhance the prompt photon sample with respect to other backgrounds such as pi0 and eta. Such cut should be optimized for our experiments and optimization requires the full-fledged QCD event generator such as PYTHIA and HERWIG, since the cut efficiency and so on will depend on event structure. In the case of PHENIX,  careful studies are irreducible especially due to its limited solid angle.

    Finally the measured asymmetry should be related to gluon polarization Delta G(x). A very crude approximation is to assume that xgluon=xquark=xT=2pT/vs as schematically shown in the Figure 1. However, we can have better estimation for kinematics of partons using QCD event generator. In addition, we can test any models against our measured data using event generator.  Figure 2 shows the predicted asymmetry for prompt photon production by using event generator and models on polarized gluon distribution. As will be discussed later, these model calculations for background require significant amount of CPU time, if we were to use fully detailed simulation. In addition, we may have to try several models on polarized parton distributions, which is also time consuming.

    There are requirements for some different types of simulations to achieve physics results from our measurements. We try to estimate the required CPU time for simulations by describing the case of prompt photon analysis in this document.

    Figure 1 Schematic view of the prompt photon production.

    Figure 2 Model calculation of asymmetry ALL for prompt photon production
    and projected errors of PHENIX measurements with Ldt=320 pb-1.
     
      2. Example: Prompt Photon Analysis

    2. Example: Prompt Photon Analysis

    2.1 Outline of the Analysis

    In order to extract asymmetry of the prompt photon from the experimental data, we evaluate produced number of the prompt photons for each beam polarization, i.e. parallel or anti-parallel. In this section, we discuss statistical error which originate from the calculation process of the produced number of the prompt photons.

    To evaluate the produced number of prompt photons, first, background photons for which we can identify its source are discarded by applying some cuts. Next, number of background photons which cannot be discarded is estimated using Monte Carlo simulation. The number of the prompt photon after the cuts is estimated by subtracting the number of background photons from that of all photons after the cuts.

    (prompt photon after cuts)=(all photons after cuts)-(background photon after cuts)
    Finally, the number of the prompt photon before the cuts is estimated by correcting the cut efficiency.
    (prompt photon before cuts)=(prompt photon after cuts)/(cut efficiency)
    This is the produced number of the prompt photon which we want.

    The major background for the prompt photon comes from pi0 decay to two photons. If both two photons are detected by the EM calorimeter, we can identify their source by calculating their invariant mass. This process is called "reconstruction cut". If one photon escapes from the detector, source of the other photon cannot be identified. These photons remain as background. When pi0 has large energy and angle of decay photons are too small, EM calorimeter cannot discriminate them from each other. They merge and are recognized as one cluster, which also remain as background. We cannot identify source of photons from other decay mode of pi0 and those from decay of other hadrons, either. For these background photons, we apply "isolation cut".

    Origin of pi0 and hadrons which make background photons is fragmentation of final quarks and gluons. The photons are included in the QCD jet. This means there are many hadrons around the photon. The isolation cut requires energy sum of hadrons around the photon must be smaller than some limit value. The prompt photon are emitted to opposite direction of quark or gluon. It can survive the isolation cut with high efficiency.

    Some hadrons are mis-identified as photons by the EM calorimeter analysis. We have also bremsstrahlung photon which originate from the apparatus. These are backgrounds which survive both cuts.

    In order to estimate the number of background photons after these cuts and to know efficiencies of the cuts for the background photons and for the prompt photons, we utilize Monte Carlo simulation. In next subsection, requirements of this Monte Carlo simulation will be discussed. In this subsection, we don't care about backgrounds from hadron mis-identification nor bremsstrahlung. These requires analysis code and detector simulation respectively. These must be done using huge CPU power at the CC-J.

    For the asymmetry calculation, we need to know effects given by asymmetries of the backgrounds. By analyzing pi0 identified by the invariant mass reconstruction, we can evaluate its asymmetry. We don't discuss about this analysis in this document.

    2.2 Simulation Requirements

    We require quantity of the simulation so that statistical error of the simulation is not a main error factor of the asymmetry calculation. For the estimation of the required quantity, we need to know rough produced numbers of the prompt photons and background photons. We used PYTHIA event generator for this purpose. For sqrt(s)=200GeV, prompt photons were generated using the prompt photon generator, and background photons were generated by the QCD jet generator.

    2.2.1 Requirement for Number of Photons

    Next tables show estimated number of all photons, sum of the prompt photons and the background photons, before and after the cuts. Luminosity to produce these numbers of photons is 320pb^-1 to consider 10-weeks run after year-3 of the RHIC run (full luminosity). Using these numbers, statistical errors from the experiment are estimated and shown on the tables. Figures show the same numbers of all photons, the prompt photons and the background photons before and after the cuts.

    photon before cuts

    p_T range (GeV/c) experiment #event statistical error statistical error (%)
    5-10 17545748 4188.76 0.02
    10-15 358431 598.69 0.17
    15-20 30657 175.09 0.57
    20-25 4739 68.84 1.45
    25-30 1094 33.08 3.02
    30-35 267 16.34 6.12
    35-40 62 7.87 12.70
    sum 17940998    

    photon after cuts

    p_T range (GeV/c) experiment #event statistical error statistical error (%)
    5-10 2895442 1701.60 0.06
    10-15 107981 328.60 0.30
    15-20 13785 117.41 0.85
    20-25 2783 52.75 1.90
    25-30 673 25.94 3.85
    30-35 169 13.00 7.69
    35-40 41 6.40 15.62
    sum 3020874    

    ChartObject photon ChartObject prompt photon ChartObject background photon

    To extract prompt photon, simulated background photons are subtracted from all experimental photons after the cuts. In the subtraction, statistical error of the simulated background must be comparable to that of the experimental photons. Next table shows estimated number of background photon which is determined to have same statistical error as that of all photons in the previous table. One exception is p_T range 5 - 10 GeV/c. We don't need precision better than 1% because there are other error factors worse than 1%.

    By subtracting the background photons from all photons, we get estimation of the prompt photon after the cuts as shown in next table. Figure below shows the number of all photons, prompt photons and background photons.

    background photon after cuts

    p_T range (GeV/c) experiment #event statistical error simulation #event statistical error (%)
    5-10 1527722 15277.22 10000.00 1.00
    10-15 15266 328.60 2158.26 2.15
    15-20 523 117.41 19.84 22.45
    20-25 201 52.75 14.52 26.25
    25-30 81 25.94 9.75 32.03
    30-35 26 13.00 4.00 50.00
    35-40 6 6.40 0.88 106.72
    sum 1543825   12207.24  

    prompt photon after cuts

    p_T range (GeV/c) experiment #event statistical error statistical error (%) simulation #event statistical error (%)
    5-10 1367720 7261.13 0.53 10000.00 1.00
    10-15 92715 399.02 0.43 10000.00 1.00
    15-20 13262 159.74 1.20 6892.50 1.20
    20-25 2582 69.22 2.68 1391.50 2.68
    25-30 592 32.27 5.45 336.50 5.45
    30-35 143 15.56 10.88 84.50 10.88
    35-40 35 7.73 22.09 20.50 22.09
    sum 1477049     28725.50  

    ChartObject photon after cuts

    In order to estimate number of the prompt photon before the cuts, efficiency of the cuts is necessary. This is also estimated by the simulation. The table above for the prompt photon before the cuts show necessary numbers for the simulation. Error of the efficiency should be comparable to that of the number of the prompt photon after the cuts. As well as the case of the necessary number of the simulated background photons, the simulated prompt photon do not need precision better than 1%. Table below shows the number of the prompt photon before the cuts, which we want as a final result. The statistical error is quadratic sum of that of the subtraction process and that of the efficiency correction. Figure shows the final estimation of the prompt photon yield with its error.

    prompt photon before cuts

    p_T range (GeV/c) experiment #event statistical error statistical error (%) simulation #event statistical error (%)
    5-10 1691354 24454.55 1.45 12366.23 0.90
    10-15 103326 1491.09 1.44 11144.48 0.95
    15-20 14098 291.20 2.07 7326.98 1.17
    20-25 2677 123.56 4.62 1442.70 2.63
    25-30 605 56.92 9.41 343.89 5.39
    30-35 145 27.26 18.80 85.68 10.80
    35-40 36 13.71 38.08 21.09 21.78
    sum 1812241     32731.04  

    ChartObject produced prompt photon

    We need 33,000 prompt photons to be simulated in the p_T region from 5GeV/c to 30GeV/c. On the other hand, 141,000 background photons are necessary to be simulated as shown in next table.

    background photon before cuts

    p_T range (GeV/c) experiment #event statistical error simulation #event statistical error (%)
    5-10 15854394 49214.94 103778.00 0.31
    10-15 255105 1343.29 36065.91 0.53
    15-20 16559 660.65 628.24 3.99
    20-25 2062 168.97 148.93 8.19
    25-30 489 63.74 58.85 13.03
    30-35 122 28.16 18.77 23.08
    35-40 26 13.33 3.80 51.27
    sum 16128757   140702.51  

    If we limit the p_T region from 10GeV/c to 30GeV/c, 20,000 prompt photons and 37,000 background photons are required.

    In next table and figure, we summarize the evaluated efficiencies and their errors of the cuts for the prompt photon and the background photon.

    cut efficiency

    p_T range (GeV/c) prompt photon statistical error statistical error (%) background photon statistical error statistical error (%)
    5-10 0.81 0.01 1.34 0.10 0.00 1.05
    10-15 0.90 0.01 1.38 0.06 0.00 2.22
    15-20 0.94 0.02 1.68 0.03 0.01 22.80
    20-25 0.96 0.04 3.76 0.10 0.03 27.50
    25-30 0.98 0.08 7.67 0.17 0.06 34.58
    30-35 0.99 0.15 15.33 0.21 0.12 55.07
    35-40 0.97 0.30 31.02 0.23 0.27 118.39

    ChartObject cut efficiency

    In the above, we considered only 7 p_T bins. When variation of the efficiency in one bin is big, we must set finer bin size to decrease uncertainty of the evaluated number of photons in the bin. Binning of acceptance in rapidity and azimuthal angle direction is necessary to be considered, especially to evaluate effects of non-orthogonal incident angle and edge of the EM calorimeter. By considering variation of the efficiency, total number of the bins are determined and quantity of required simulation is determined.

    2.2.2 Requirement for Number of Events

    In this study, prompt photons were generated with PYTHIA prompt photon generator by dividing parton reaction p_T range into five range, 2-5 GeV/c, 5-10 GeV/c, 10-20 GeV/c, 20-30 GeV/c and 30-100 GeV/c. Background photons were generated with PYTHIA QCD jet generator by dividing parton reaction p_T range into the same five range. Next tables show the generated prompt photons and background photons for about 50,000 events generation in each parton reaction p_T range.

    prompt photon yield

    prompt photon       prompt photon p_T range (GeV/c)            
    parton reaction p_T range (GeV/c) #event cross section (mb) luminosity (/pb) 5-10 10-15 15-20 20-25 25-30 30-35 35-40
    2-5 71508 1.79E-03 4.00E-02 7403 14 0 0 0 0 0
    5-10 50851 6.36E-05 8.00E-01 266811 8864 218 4 0 0 0
    10-20 49032 3.06E-06 1.60E+01 159172 333106 61702 4973 438 44 3
    20-30 45816 5.73E-08 8.00E+02 8794 31941 220749 414359 117156 12837 1515
    30-100 49425 2.47E-09 2.00E+04 5456 9098 19382 56813 303232 527693 181479
    sum       447636 383023 302051 476149 420826 540574 182997

    background photon yield

    QCD jet       background photon p_T range (GeV/c)            
    parton reaction p_T range (GeV/c) #event cross section (mb) luminosity (/pb) 5-10 10-15 15-20 20-25 25-30 30-35 35-40
    2-5 49752 9.95E+00 5.00E-06 36 0 0 0 0 0 0
    5-10 41839 1.67E-01 2.50E-04 5655 15 1 0 0 0 0
    10-20 48678 4.87E-03 1.00E-02 174731 4807 118 8 0 0 0
    20-30 50292 6.29E-05 8.00E-01 1609110 171720 21005 2224 273 22 2
    30-100 51159 2.56E-06 2.00E+01 4809728 837076 193787 57276 23721 7103 1593
    sum       6599260 1013618 214911 59508 23994 7125 1595

    If we want to generate the required number of photons as explained in the previous subsection, number of prompt photon events to produce prompt photons and number of QCD jet events to produce background photons are following;

    p_T range (GeV/c)prompt photonQCD jet
    2-5 7100220000
    5-10 7100220000
    10-20 7100220000
    20-30 120 2900
    30-100 5.9 120
    To generate high p_T photons (more than 15GeV/c for the prompt photon and more than 10GeV/c for the background photon), we need parton reactions whose p_T ranges are 10-20 GeV/c, 20-30 GeV/c and 30-100 GeV/c. Number of events which should be generated in these p_T ranges are proportional to the cross section value for these p_T ranges. On the other hand, we don't need number of events proportional to the cross section for parton reactions whose p_T ranges are 2-5 GeV/c and 5-10 GeV/c. The same numbers of events as that for 10-20 GeV/c range are enough to generate the required number of events at the lower p_T range.

    3. Simulation of QCD jets in PHENIX Detector System


    In most of the spin physics studies, we are interested in the rare process, such as prompt photon with high transverse momentum, Drell-Yan production of lepton pairs, and so on.  Those cross sections are typically smaller than QCD jet production, which is the source of background,  by factor of 1E-3.  Therefore study of background reduction is one of the most important areas of the off-line software development.

    Usually such study requires monte-carlo event generation, especially if the analysis or study are relevant to event structure, such as particle correlation, multiplicity, and so on, we need to utilize so called QCD event generator, e.g. PYTHIA.  Since event generation itself is time consuming in addition to the detector response simulation, we need to organize the tasks in efficient way.

    After a short overview of QCD jet production, we propose an efficient method to save CPU time.
     

    3.1 QCD jet production in pp collisions at vs=200 GeV

    In the lowest order of the QCD process, the jet production is a result of hard scattering of two partons. Figure 3 schematically shows inclusive production of hadron C in the the collision of hadron A and B.


    Figure 3 Schematic description of inclusive production of hadron C in collision of hadron A and B. "f" stands for structure function, ab --> cd is the partonic level reaction and D represents the fragmentation function.

    The cross section of this reaction can be written as

    and it decreases drastically along pT as shown in Figure 4. For example, the jet with pT=30 GeV/c is less frequent than 10 GeV/c jet by factor of 1000.


    Figure 4 QCD jet production in pp collisions at 200 GeV.
     

    Figure 5 shows the fraction of contribution from subprocess to jet production as a function of pT of jet. In the lowest pT region, gluon-gluon scattering is the dominant process, at mid-pT quark-gluon scattering is the main source, and at high-pT region quark-quark scattering dominates the production.

    In unpolarized experiment, we do not care even a background comes from gluon-gluon scattering or quark-gluon scattering. However, in polarized case, we DO care since different process will contribute to asymmetry differently.

    Figure 5 Fraction of contributions from each subprocess to jet production in pp collision at sqrt(s)=200 GeV.

    Table 1 summarizes the cross sections for QCD processes at the leading order for pT>2.0 GeV/c.
     
     
    Subprocess Sigma (mb) 
    f + f' -> f + f' (QCD)  6.330E-01
    f + f~ -> f' + f~'  8.713E-03
    f + f~ -> g + g  9.574E-03
    f + g -> f + g  4.435E+00
    g + g -> f + f~  1.384E-01
    g + g -> g + g  4.868E+00
    total  1.009E+01

    Table 1 PYTHIA cross section summary table for jet production in pp collision at 200 GeV where pT>2.0 GeV/c
     
     

    3.2 Simulation of QCD jet

    As shown in the previous section, the high pT process is rare and it is easily suppressed by factor of 1000. This means if we want to generate 1 event of 30 GeV/c jet in simulation, we have to generate 1000 events of unnecessary 10 GeV/c jet production. This is time consuming and painful process.

    Fortunately, we can limit the pT range in the event generation. e.g. 10<pT<11 GeV/c, or 30<pT<31 GeV/c.  So 30 GeV/c jet event can be generated as quick as 10 GeV/c. Since natural abundance of 30 GeV/c jet is 1000 times less than 10 GeV/c jet, this method saves CPU time (and data size)  by factor of ~1000. Figure 6 compares two methods: one is to generate 100K events without any pT selection, and the other is to generate only 10K events in 20 separate pT bins, e.g. 200K events in total. The former methods could generate QCD jet only upto 20 GeV/c and the latter was successful in generating jet upto 70 GeV/c. Since pT max in 200 GeV collision is 100 GeV/c, this is more than enough. It should be noted that in the low pT region both methods precisely agree as shown in the embedded box.


    Figure 6 QCD jet calculation in two methods: One without pT cut but large number of events, the other with pT selection with less number of events.

    When we look at pi0, however,  the resulted plot is not very smooth as shown in Figure 7. Obviously some process in the simulation seems limited by statistics. Main difference between jet production and pi0 production is in inclusion of fragmentation function in pi0 production. As shown in Figure 8 the fragmentation function has wide range of value depending on z, which is the fraction of final parton momentum carried by pi0. Indeed, the function ranges from 200 down to 0.01. Since we have another distributions to be folded in to calculate cross sections,  such as structure functions and angular distribution of cross sections, 10K events per pT bin is simply not enough. Figure 9 shows results of simulation with pT cut in 49 pT bins. Blue histogram corresponds to 100K per bin and red one does to 10K per bin. Green line is the smooth curve on 100K. In the embedded box, ratios of the differences between histogram and smooth curve to smooth curve for both simulations are shown . So ideally smooth distribution corresponds to "0" which is shown by dotted line.  Obviously 100K simulation is by far more smooth.

    Figure 7 pT distribution of pi0 calculated by two methods. Even for event generation with pT cut, the distribution is not smooth, presumably statistical fluctuation in fragmentation process.


    Figure 8  Fragmentation function of pi0 measured in two experiments at LEP.  Both agree well.
     


    Figure 9 pT distribution of pi0 calculated by two methods; 100K events per pT bin and 10k events per pT bins.

    As discussed in the previous section, simulated results does not have to be smooth as far as the systematic error is negligible size comparing to statistical error. However, model calculations should be smooth ideally. And we need large number of simulations for the process which invlove fragmentation function. For example single muon from open charm production is a result of fragmentation and decay, and it should require large number of events to come up with better model calculation on cross sections and asymmetries.

    It should be, however,  noted that this kind of simulation does not have to be fully simulated one, which includes detailed detector responce. The study can be done with event generator and parametrized detector performance, such as energy resolution, position resolution, efficiencies and so on.
     

    4. Estimation of CPU Time

    Particle multiplicity in the detector acceptance is the most important parameter to estimate the CPU time for simulations. It depends on the transverse momentum of the reaction. Figure 10 clearly shows the increase of particle multiplicity as functions of pT for charged particles, photons, and neutral pions. Using particle multiplicity and measured CPU time for pp event generation, we estimate rquired CPU time for pp collisions.

    4.1 Event Generation

    We have measured CPU time for simulation of QCD jet production. The CPU time only  includes PISA part, i.e. does not includes CPU time for event generation itself. The results are summarized in Table 2. The numbers are only for Central Arms, but we know that Muon Arm simulation will take longer CPU time by factor of about 6 especially due to thicker absorbers.
     
    CPU Time with 8 SpecInt95
    pT>10 GeV/c 10.5 sec
    pT>40 GeV/c 48.7 sec
    Table 2 CPU time for QCD jet event generation using PISA.

    The higher pT threshold is, the more CPU time is required. This is due to the higher particle multiplicity and larger photon energy resulting in longer CPU time for shower development in EM calorimeter. Figure 10 shows multiplicity of charged particle, photon, and pi0 in the PHENIX acceptance. The particle multiplicity increases logarithmically.  The CPU time for shower development grows faster than linear in photon energy. We crudely assume overall growth of CPU time is linear in pT.


    Figure 10 Particle multiplicity of charged particle, photon, and pi0.

    We find CPU time (SPecInt95*sec) = 10.2 *pT - 17.9. Probably this expression underestimates lower pT but this error is minimal since lower pT jet consumes small CPU time anyway. Following table summarizes required CPU time for QCD jet simulations.
     
    p_T range (GeV/c) CPU time/event (SpecInt95*sec) # of events CPU time (SpecInt95*sec)
    2-5
    2.5
    220K
    550K
    5-10
    33.1
    220K
    7282K
    10-20
    84.0
    220K
    18480K
    20-30
    185.9
    2900
    539K
    30-100
    287.8
    120
    35K
    total
       
    26886K = 27M

    Consequently, the required CPU time for the QCD jet process is 27M SpecInt95*sec.

    This is only for Central Arm and for the entire PHENIX detector, we have to add Muon Arm portion, which is known to be more CPU intensive by factor of 6. Finally the total CPU requirements for simulation for QCD jet production is:  189M SpecInt95*sec. We will need to complete this kind of simulation in 2 months (5.2 M sec) for timely publication of the results. We expect one big run of this sort per year to reflect
    (a) improved knowledge on detector performance
    (b) new configuration of detector
    (c) different beam energies, e.g. sqrt(s)=500 GeV
    Thus we need 36 SpecInt95, even in 100% efficient environment. Assuming 80% efficiency of the CPU utilization, 45 SpecInt95 will be the required CPU for spin physics simulations.

    As for the model calculations, we will easily eat up the planned CPU (10K SpecInt95) if we do full simulations for required 100K events. However, such simulation can be done with only event generator and some parametrized detector performance, which should require negligible CPU comparing to full simulations.
     
     

    4.2 Event Reconstruction

    From recent summary from Mock Data Challenge, we have learned that
    conversion of simulation data to PRDF itself is time consuming. Figure 11 shows elapsed time with 8.6 SpecInt95 for both conversion to PRDF and reconstruction in Central Arms as functions of total particle multiplicity. It seems that conversion time increase along multiplicity linearly and reconstruction time does quadraticaly. By extrapolating these down to ~100, we expect 50 sec of PRDF conversion time and 25 sec of reconstruction time per pp collision event. Thus we obtain

    (50+25)sec *8.6 SpecInt95 = 645 SpecInt95*sec per event

    We expect similar CPU time for Muon Arms. However we foresee significant reduction of computing time especially simplifying the data conversion process and so on and we would expect ~300 SpecInt95*sec per pp event in Central Arm, and another ~300 SpecInt95*sec per pp event in Muon Arm. Since we have 600K simulated events, we need 360M SpecInt95*sec.  Assuming 80% efficiency and 2 months for completion,. we need 85 SpecInt95 of CPU.

    Figure 11 Elapsed CPU time for data conversion to PRDF and reconstruction with 8.6 SpecInt95 CPU obtained from MDC-1.


    Figure 12  Total charged and photon multiplicity as functions of pT of reaction.
     

    4.3 Summary of CPU needs

    We have estimated required CPU time for event simulation and reconstruction of simulated data to be 45 and 85 SpecInt95, respectively. Altough siginificant reduction of reconstruction time is expected, comparable CPU time to event simulation will be required. In addition, we will need to generate events with several different structure functions to find the best model to reproduce our experimental results. Therefore, we will need (45+85) times about 5 = 500 SpecInt95 of CPU for spin physics analysis.
     
     
     

    Appendix B : US-Japan WAN connectivity

    In this Appendix, the connectivity between BNL and Japanese PHENIX collaborating institutes are described. Following figure show the ESnet Backbone in 1998. BNL is connected at T3 (45 Mbps) to the ESnet(http://www.es.net/).

    There are several PHENIX collaborating institutes in Japan. Some of them belongs to the Science and Technology Agency (STA) and the others belong to the Ministry of Education (MOE). STA operates Inter Ministry Network (IMnet) and has its own Japan-US leased line (see www.imnet.ad.jp). Also MOE operates Science Information Network (sinet) and has own Japan-US leased line. HEPNET-J is operated at KEK and shares the Japan-US leased line of sinet. There are several other networking providers which PHENIX collaborating institutes are using. As a result there are several US-Japan leased lines between BNL and Phenix institutes in Japan.

    CC-J is planning to use the APAN as the primary connection between Japan and US, because of its large bandwidth and capability. Following figure show the current topology of the BNL and PHENIX-J institutes.

    The next figure shows the topology of the APAN. In USA side, APAN is connected to the ESnet at STAR TAP point which is located at Chicago. STAR TAP stands for Science, Technology And Research Transit Access Point and is a persistent infrastructure, funded by the NSF CISE Networking and Communications Research and Infrastructure division, to facilitate the long-term interconnection and interoperability of advanced international networking in support of applications, performance measuring, and technology evaluations. The STAR TAP anchors the international vBNS connections program. (see http://www.startap.net) The Routing between ESnet and APAN at START TAP stated in November 1998.